Rebar Alternatives Save Big $$$

Contact Us

Fill out the form below to request more information from our Bladensburg location.

"*" indicates required fields

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

View our privacy policy

MD: Bladensburg

(301) 927-8300

4700 Annapolis Road, Bladensburg, MD 20710, USA

Mon-Fri 6:30AM to 4:00PM Saturday 6:30AM to 12:00PM Sunday CLOSED

Get In Touch with someone at MD: Bladensburg
(301) 927-8300

"*" indicates required fields

Accepted file types: pdf, txt, Max. file size: 2 MB.
This field is hidden when viewing the form
Response time within 4 hours

Permeable Articulating Concrete Blocks (P-ACB) for Stormwater Management

About

Permeable Articulating Concrete Blocks (P-ACB) offers advantage over interlocking concrete pavers as permeable pavement system. By leaving joints open, these systems have substantially elevated surface infiltration rates and simplified maintenance processes. Because P-ACB systems use thicker blocks and they interlock, the surfaces can be HS-20 rated for heavy traffic– expanding the design possibilities. From a stormwater management and maintenance perspective it is possible to monitor the water level in the base and document performance and optimize maintenance schedule.

Objectives

  1. After attending this session, participants should be able to: Compare and Contrast Articulating Concrete Blocks (ACB) [ASTM D6684] with Interlocking Concrete Pavers [ASTM C936]. Both of these systems support sustainable building by helping to better manage stormwater, because they are permeable pavement surfaces. The presence of open joints, substantially changes the properties of the system.
  2. After attending this session, participants should be able to: Understand how a P-ACB pavement system can be installed. The ideal process is: 1) Plan out the system, 2) Place and compact the base (including geofabrics) 3) Place the blocks 4) Place and pave asphalt/concrete. Correct installation is critical for its performance as a stormwater best management practice.
  3. After attending this session, participants should be able to understand the expected performance of a P-ACB pavement system as a stormwater best management practice.
  4. After attending this session, participants should be able to understand best practices to maintain a P-ACB pavement system to ensure proper performance over the life of the product as a stormwater best management practice

https://www.usgbc.org/education/sessions/permeable-articulating-concrete-blocks-p-acb-stormwater-management-12847946