CMU Fire Rating Chart
Ernest Maier CMU Complying with IBC 2003
Equivalent Thickness Table 6.0 – Tek Note 7.01D
2005 Supplement
Fire Resistance | Nominal Size | ASTM | Solid Materials | Equivalent Thickness (in) |
½ Hour | 2x8x16
3x8x16* |
C-145
C-90 |
100% 79% |
1.9 1.9 |
¾ Hour | 4x8x16
3x8x16 |
C-90
C-145 |
65% 100% |
2.4 2.6 |
1 Hour | 4x8x16
4x8x12 4x8x16* |
C-90
C-90 C-145 |
79% 73% 78% |
2.7 2.7 2.8 |
1 ½ Hours | 6x8x16
8x8x16 Normal Weight |
C-90
C-90 |
54% 50% |
3.0 3.8 |
2 Hours | 2-1/4×3-3/4×8**
4x8x16 4x8x12 8x8x24*** 6x8x16*** 8x8x16 Lightweight*** |
C-55
C-145 C-145 C-90 C-90 C-90 |
100% 100% 100% 52% 64% 50% |
3.6 3.6 3.6 3.7 3.6 3.8 |
3 Hours | 8x8x16
10x8x16 |
C-90
C-90 |
63% 50% |
4.8 4.8 |
4 Hours | 8x8x16
8x8x12 12x8x12*** 12x8x16 6x8x16 8x8x12 8x8x16 |
C-145
C-145 C-90 C-90 C-145 C-145 C-145 |
75% 75% 55% 50% 100% 100% 100% |
5.7 5.7 5.4 5.6 5.6 7.6 7.6 |
CMU Fire Resistance Calculator
* BMS 92 – National Bureau Standard
** Concrete Brick
Primary Aggregates – Expanded Shale and/or Pumice
Above Blocks Plastered on One Side with 1/2 inch 1:3 Gypsum and Sand Plaster adds 1/2 Hour to Fire Rating
VP of MasonryTed Kelly
Latest News
Building a Better Sea Wall
Waterfront property is the best: sea breezes, water access, and views. Unfortunately water and shoreline are always in a bit […]
Stop Building Tunnels for Stormwater
Engineers love big projects. They are statements of competence, and also make big money. However, bigger isn’t always better and […]
Understanding The Installation Costs Of Permeable Pavement
Permeable pavement has emerged as a leading solution in modern construction, known for its environmental benefits and ability to manage […]
What Accessories Do You Need For Working With Concrete?
Working with concrete is an integral part of construction, whether it involves laying foundations, building structures, or creating pathways. The […]