Current Fuel Surcharge - $10 per pallet. For more information click here

Contact Us

Fill out the form below to request more information from our Bladensburg location.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form

View our privacy policy

MD: Bladensburg

(301) 927-8300

4700 Annapolis Road, Bladensburg, MD 20710, USA

Mon-Fri 6:30AM to 4:00PM Saturday 6:30AM to 12:00PM Sunday CLOSED

Get In Touch with someone at MD: Bladensburg
(301) 927-8300

"*" indicates required fields

Accepted file types: pdf, txt, Max. file size: 2 MB.
This field is hidden when viewing the form
Response time within 4 hours

Better for the Bay: A PaveDrain Case Study

Aaron Fisher | August 27, 2023

Ernest Maier and PaveDrain are proud to announce the release of our latest case study highlighting the performance of an award-winning installation in Colmar Manor, MD that greatly exceeded the Maryland Department of Environment’s (MDE) design guidance for permeable pavement. This system delivered significant ROI, reducing stormwater compliance costs borne by the Town, without requiring maintenance in the existing public right-of-way. And while we love breathless press releases as much as the next guy, these claims are all backed up by a two year University of Maryland study (Dr. Allen Davis).

——–

An asphalt traffic intersection in Colmar Manor, MD was replaced with PaveDrain heavy-duty permeable pavement, along with an in-situ water level sensor for performance monitoring. This project was undertaken to address the frequent stormwater challenges in the Town of Colmar Manor in Prince George’s County, Maryland. Colmar Manor is one of the Anacostia River’s Historic Port Towns. Many of these communities are low-income neighborhoods, and the implementation of this BMP represents restorative environmental justice. As a low-lying area with a high degree of impervious cover it is frequently challenged by poor drainage and pluvial flooding.

In the two years since it was installed the system is functioning as a roadway and stormwater BMP without maintenance, representing a commitment to environmental justice in this economically disadvantaged neighborhood. Furthermore, the use of sensors has documented stormwater performance well in excess of expected, suitable for crediting towards – giving extra credit towards – local stormwater compliance.

Better for the Bay- PaveDrain Case Study

Full University of Maryland Study

VP of Business DevelopmentAaron Fisher

Phone
Location
MD: Bladensburg
Languages
English

Latest News

Saving on School Construction

Saving on School Construction

A new school is a big financial and community investment. It makes a community more attractive to students, teachers, families, […]

Read More
Insurance: Impacted by Material Choices

Insurance: Impacted by Material Choices

With the increased risk of disasters and the cost of construction; insurance costs are up. But, they aren’t going up […]

Read More
Wastefully Fixing Traffic Barriers

Wastefully Fixing Traffic Barriers

On I-495 and I-270, MDOT has been stapling Steel W-Beam Barriers to crumbling concrete barriers.Ā What happened to these barriers? And […]

Read More
Building for Tomorrow, Today

Building for Tomorrow, Today

Every building or structure has a designated lifetime: 30 years, 50 years, 100 years. However what happens when the conditions […]

Read More